| 3-10-09: String is used to measure where the soil will land. |
3-13-09: These numerals are buried to the correct level |
|
|
| 3-17-09: Pea gravel allows drainage inside the numerals |
3-18-09: David and Jon fill the numerals with soil |
|
|
| 3-20-09: Irrigation and part of hedge planted |
3-24-09: David Middleton, MBG horticulturist for the Floral Clock, planting yews |
|
|
| 3-24-09: Yew hedge planted, irrigation installed and soil smoothed out again. |
3-30-09: Clock motor placed and sealed |
|
|
| 3-30-09: Unloading clock hands |
3-30-09: Installing the first hand |